Customer Testimonials
 

"The EmpowerMX Production Manager solution for Heavy Maintenance led to 15% improvement in cycle or span times required for execution of scheduled checks. Southwest was able to use these savings to bring additional maintenance work in-house. The solution also gave us the tool required to successfully manage the conversion of our fleet to a MSG-3 maintenance program."

- Dave Fisher, Senior Director, Operations and Planning, Southwest Airlines

 

"Based on our experience with the EmpowerMX product in our Charlotte facility, US Airways has decided to expand use of the product into our Pittsburgh base."

- Joseph Beery, Senior Vice President and CIO, US Airways

 

 

"We required a quick and thorough implementation as part of the contract and the EmpowerMX staff worked very closely with our operations and information technology team to ensure Production Manager was up and running and our maintenance staff was trained on an aggressive schedule to meet the requirements of the initial scheduled A319 check. In addition, we were looking for an application that would give us the ability to use our labor resources efficiently and to capture the information for future event planning and scheduling. So far, Production Manager has more than met those expectations."

- Rodney Lueckenotte, Director, Heavy Maintenance, Frontier Airlines

 

 

 
 
Copyright © EmpowerMX 1999-2007. All rights reserved.